All development

Development project

Hammock Bay PDP 5

Also called: Hammock Bay Planned Development Project 5Approved: Density revision approved

HomesApprovedConfirmed

Sources for this project: City meeting.

About this project

The final phase of the Hammock Bay residential development along Powerline Road, adding 163 lots with several code .

Key facts

Who is deciding
City of Freeport
Homes or units
163162 single-family lots approved Feb 27, 2025; one unit added Aug 12, 2025
Size
43.95 acresCity Council minutes, Feb 27, 2025
Where
Approximate location. Near Hansen Road; the agenda places it just south of Hansen Road on Bay Loop EastAs the agenda worded it: Powerline Road; East side of Bay Loop East, 200 feet south of Hansen Road, extending almost to Powerline Road

The ring marks the general area. The site itself could be anywhere near it.

Timeline

3 items, oldest first. Each links to the meeting and the original documents.

  1. Feb 5, 2025Planning and Development Review Board

    Hammock Bay Planned Development Project 5

    Planning board approvalPassed 4–0 · unanimousUnder review

    The board approved the final phase of Hammock Bay development comprising 163 lots with multiple from standards, including increased (162 units instead of 122), reduced lot widths and sizes, increased impervious surface ratio, and reduced . Approval was conditioned on maintaining a 25-foot natural vegetative buffer along Powerline Road on the south side, including a disclosure about the neighboring bee farm in HOA documents, and requiring a 6-foot privacy fence along the rear of lots neighboring the bee farm property to address resident concerns about living near the bee farm.

    Meeting page Agenda (Word)Minutes (PDF)

  2. Feb 27, 2025City Council

    Hammock Bay PDP 5 Approval

    Council final approval (Resolution 2025-01)Passed 4–0 · unanimousApproved

    Planning Director presented the final neighborhood of Hammock Bay development, a 43.95-acre residential project with 162 single-family lots (previously approved in September 2024). The Planning and Development Review Board recommended approval with conditions on February 5. The project includes several (reduced lot widths, , and pool placement) consistent with other Hammock Bay phases. Conditions include disclosure of adjacent bee farm, installation of a 6-foot privacy fence along the bee farm boundary, and a 25-foot native vegetation buffer for residents on Powerline Road. 2025-01.

    Meeting page Agenda (PDF)Minutes (PDF)

  3. Aug 12, 2025City Council

    Hammock Bay PDP 5 Revision

    Density revision approvedPassed 5–0 · unanimousApproved

    Council approved a revision to the Hammock Bay Plan 5 allowing developers to add 1 additional dwelling unit, bringing total from 162 to 163 units. All other recommendations remain the same as the original PDP, with surplus density available.

    Meeting page Agenda (PDF)Minutes (PDF)

Written partly by AI from the documents linked above; check them before relying on a detail · Independent, not an official city site · Source · Privacy · Terms