SR 83 (US 331) from N of Owls Head to North of Fire Dept Entrance
Approved: Funded; design or pre-construction work underway (per FDOT)
RoadApprovedConfirmed
Sources for this project: FDOT work program.
About this project
Resurfacing on SR 83 (US 331) from N of Owls Head to North of Fire Dept Entrance. Listed in the Florida Department of Transportation () five-year Work Program for FY 2027–2029.
Key facts
- Who is deciding
- State of Florida
- State work program
- Resurfacing, fiscal years 2027–2029FDOT item 456980
- Where
- Exact location. FDOT project route
Timeline
1 item, oldest first. Each links to the meeting and the original documents.
- FY 2027–2029FDOT Work Program
Resurfacing (FDOT item 456980)
Funded; design or pre-construction work underway (per FDOT)Approved