Development project
The Exchange at Owl's Head
Also called: The Exchange at Owl's Head (news report)Approved: Stormwater permit issued (per the water district); construction not confirmed
Worth double-checking
- Type and size come from a news story; the permit itself does not say what will be built.
Sources for this project: News report, Water district permit.
About this project
Hathaway Development, LLC holds a 2024 water district stormwater permit for this 24.6-acre site. SoWal.com (January 2026) describes The Exchange at Owl's Head as a mixed-use development with more than 300 homes, in planning and approval.
Key facts
- Who is deciding
- NW Florida Water Management District
- Size
- 24.63 acresProject area on the water district permit
- Where
- Exact location. Site location given on the water district permit
Timeline
2 items, oldest first. Each links to the meeting and the original documents.
- Sep 4, 2024NW Florida Water Management District
Environmental resource permit issued: Exchange at Owl's Head
Stormwater permit issuedApprovedApplicant: Hathaway Development, LLC. ERP Individual no. 319492, applied 2024-07-25, covering about 24.63 acres. The permit approves the site's stormwater plan; it does not say what will be built or when.
- January 2026SoWal.com
News report: The Exchange at Owl's Head, mixed use with 300+ homes
Reported in the newsDescribed as a mixed-use development with more than 300 homes, in planning and approval.
Records combined into this project
These looked like separate projects in different sources but are the same place, so their timelines are merged above.
- The Exchange at Owl's Head (news report)
Other sources
Written partly by AI from the documents linked above; check them before relying on a detail · Independent, not an official city site · Source · Privacy · Terms